Leave Your Message
YUDO Hot Runner Flip Top Cap Mold with Automatic closing system

Injection Mould

YUDO Hot Runner Flip Top Cap Mold with Automatic closing system

Plastic material: PP and can be customized

Mold usage: Shampoo bottle, detergent, cosmetics bottle

The hot runner is the key to the good or bad performance of the cap mold. The hot runner designed by this product absorbs the advanced technology from abroad and combines with the needs of domestic customers, adopting the design of no-cut gate and separate temperature control of hot runner nozzle. (The advantages of separate control to solve the problems arising in the production process, such as white at the bottom, drawing). The molds are produced under fully automatic conditions without frequent operation by employees to reduce the labor of workers.

Our company has a professional cap mold design team, and the company adopts advanced CAD to assist in the design of cap molds. The main parts of the mold, such as core, cavity and screw port, are made of imported steel from Germany. The cooling system is optimized to reduce the cycle time of the mold. Meanwhile, the unique hot runner design of our machinery ensures equal injection pressure.

    Mold Life Time: 3-5 million shots
    Surface Request: High polish
    Core& Cavity: 2083/2344
    Mold Base:4CR13/2085
    Runner System: YUDO//HUSKY
    Mould gate type: Pin gate
    Mould ejector type: Push/ unscrew by hydraulic
    Place of Origin: Taizhou, China

    We pay great attention to mold quality:

    1. Provide the original certificate of country of origin of the material and the original heat proof of the material.
    2. Excellent mold design.
    3. Easy to clean on the machine: If the product material is leaking, you can clean it directly on the machine.

    FAQ

    (1): Before installing the mold, the upper and lower surfaces of the mold should be cleaned to ensure that the mold installation surface and the press work surface are free from pressure injuries and the parallelism of the upper and lower installation surfaces of the mold during production.
    (2): After the mold is installed, open the mold and clean all parts of the mold, especially the guide mechanism. For the surface part mold, the profile surface should be cleaned to ensure the quality of the part
    (3): Apply grease to lubricate the sliding parts of the mold.
    2. The mould quality is good, but there is bubbles problem appeared on the product, why?
    (1): Low injection pressure,
    (2): Insufficient injection holding pressure,
    (3): Short holding time ·Injection speed is too fast or too slow,
    (4): Resin temperature is too low or too high,
    (5): Air is mixed into the screw.

    Leave Your Message